| Jeremy added the handles and a latch to seal the attic door |
| Cutting the insulation bags in 1/2 to insert into machine |
| AttiCat machine |
| the completed addition now full of insulation |
In the meantime, everything's been as usual. Hayde and I have gotten out running. Since I've been on site, I haven't made it to the track workouts anymore, but I'm trying to do a few interval runs on my own instead. Jeremy and I will go when it's his turn to run. This week and last, we managed over 9 miles at running club for the Sunday long run. It was a bit of work last week and this week my muscles seem a bit run down. I'm wondering if I haven't gotten enough carbs in me after lifting a few nights. Anyway, I think we're ready to get the eco energy guy back in to do the follow-up re-assessment. Jeremy's also going to try to stay late for a night this week and next to see if he can get enough time to take a week and go down to Florida to see Jeremy's family. I'm hoping I'll be allowed to get a week off since I've been thoroughly instructed when I can even ask for time off. Enjoy the next few pictures. The animals have seem to grown more fond of each other recently and Stewart's really stepped it up. Before I forget, we've had really nice weather the last couple of weeks. It got up close to 40F a couple of days. Our snow was starting to slowly melt and we actually got down to the pavement in the driveway a few places! BUT, yes, we got hit with another shot of snow Friday afternoon/evening. We probably got around 6 inches. It got super windy Saturday too, but the temps weren't too bad - it just felt colder. Apparently, we're in for more snow this week. Just when spring felt like it was on its way....(I didn't get out with my camera yet - so sorry, no pictures.)
| Stewart crawled up on his own! |
| Hayde with us in the weight room |

No comments:
Post a Comment